Schedule a physical connection

Note: Use this form to apply for a high load consent if you’re moving any load over five metres under power lines. Please allow at least five working days for approval.  Please click here for the WEL network boundary.

APPROVED CONNECTION BOOKING REQUEST

Please read this description prior to filling out the below form

This form is used to request a booking date for the physical connection of a mains cable onto the WEL Network. You must have already applied for and been granted approval for a connection onto the WEL Network. If not, please complete this step here: www.wel.co.nz/get-connected before filling out this request form.

To complete a physical connection, the service cables must be made off at the mains switch, run underground all the way to the boundary edge, with enough length remaining to reach the connection point. If any digging outside the boundary is required to be done by WEL and is greater than 2m or not in soil, please contact us to discuss.